WJ News

Latest News and Updates from WJ Groundwater and across the Industry.

Arabian-Tunneling-Conference1.jpg

Toby Roberts’ Presentation on Crossrail CP6 ‘Well’ Received

Dr Toby Roberts, the Chairman of WJ, gave a fascinating presentation on dewatering cross passages using in-tunnel well systems. The presentation was one of the features at the 3rd Arabian Tunnelling Conference & Exhibition 2015 held in Dubai, UAE in November.

WJ Tunneling Dewatering

 

Toby’s presentation focused on a specific cross passage, Crossrail CP6, which, despite challenging ground conditions and programme constraints, WJ was able to dewater successfully. The installations were carried out using techniques developed at WJ that allows probe holes and dewatering wells to be installed from inside tunnels and basements under high external water pressure. The dry cross passage was constructed by main contractor Dragados Sisk JV using an open face timber heading with SGI rings and reinforced concrete collars. WJ has used these techniques to install dewatering systems to allow the repair of leaking basements and tunnels where there has been an external head of water in excess of 10 metres. The dewatering was carried out using a combination of inclined wellpoints and ejector wells.
To learn more about the event in general please visit our previous article here.

Arabian Tunneling Conference


WJ Groundwater is an industry expert across a range of infrastructure sectors that includes; ports and marine, motorways, tunnels and shafts, to name a few. We are known specialists in:

Please visit our What We Do page to discover even more about our Groundwater management projects. You can also phone +44 (0)20 8950 7256 to discuss your project ideas and options today.

WJ Groundwater Tunneling InnovationClick to enlarge photographs

Photos by Ollie Vincent

WJ GroundwaterToby Roberts’ Presentation on Crossrail CP6 ‘Well’ Received
Share this post

Join the conversation

Related Posts