Infrastructure

There is now a greater demand than ever before for both new and replacement infrastructure. WJ has an enviable track record of delivering dewatering schemes for major infrastructure projects to demanding programmes. Successful delivery requires a strong design and installation team capable of meticulous planning and close coordination with other contractors and stakeholders. We have worked extensively on projects such as The Lee Sewer Tunnel in East London, the Jubilee Line Extension, the Channel Tunnel Rail Link Phases 1 and 2 and more recently on Crossrail.

Featured Infrastructure Projects

Crossrail Station, Canary Wharf

Crossrail Station, Canary Wharf

  • Deepwell Dewatering
  • -Read More-
  • Crossrail Underground Station at Farringdon

    Crossrail Underground Station at Farringdon

  • Well Drilling
  • Probe Drilling
  • -Read More-
  • London Gateway Port

    London Gateway Port

    London Gateway is a development on the north bank of the River Thames in Thurrock, Essex, around 20 miles east of central London.

    New London Embassy

    New London Embassy

  • Remediation
  • Deepwell Dewatering
  • -Read More-
  • WJ Group AdminInfrastructure